Delivery dates you can actually hold

It tells you what the shop floor can do before you promise a date. Not what you wish it could do.

This demo is live. Click the buttons inside it.

The APS screens with invented data: the production timeline, a "what if" scenario, and checking a date before you promise it to a customer.

D&A Management SoftwareDemo workspace, invented data.

Try itChange the window (1d, 3d, 7d) and click a block for its details. The list below is the same plan, machine by machine.

Production timeline
Blocks are drawn to scale on an hourly axis (shift 07:00–20:00). Drag a block to another machine or time — the system checks the move before it accepts it.
Today
Thu 8 Oct0810121416182022
Fri 9 Oct0810121416182022
Sat 10 Oct0810121416182022
Milling Center M1CNC-M1
closed
CNC Lathe L2CNC-L2
closed
Band Saw S1SAW-S1
closed
Gear Hobber H1HOB-H1
closed
Planned schedule (next 7 days)
The same plan as the timeline above, machine by machine. Advisory — delivery dates shown elsewhere in the app stay as they are.
Milling Center M1 6 blocks · 34h 48m
8 Oct, 07:00 → 8 Oct, 16:00CMD-2026-0433 · Bearing housing 6208 · CNC Milling (30 pcs)9h 0m
8 Oct, 16:00 → 8 Oct, 16:48CMD-2026-0440 · Flange DN100 PN16 · CNC Milling · setup48m
8 Oct, 16:48 → 8 Oct, 20:00CMD-2026-0440 · Flange DN100 PN16 · CNC Milling (1/3 · 8 pcs)3h 12m
9 Oct, 07:00 → 9 Oct, 20:00CMD-2026-0440 · Flange DN100 PN16 · CNC Milling (2/3 · 34 pcs)13h 0m
12 Oct, 07:00 → 12 Oct, 07:48CMD-2026-0440 · Flange DN100 PN16 · CNC Milling (3/3 · 2 pcs)48m
12 Oct, 07:48 → 12 Oct, 15:48CMD-2026-0451 · Spur gear z=32 m=2 · CNC Milling (24 pcs)8h 0m
CNC Lathe L2 6 blocks · 26h 36m
8 Oct, 07:00 → 8 Oct, 07:36CMD-2026-0446 · Drive shaft Ø50 · CNC Turning · setup36m
8 Oct, 07:36 → 8 Oct, 19:36CMD-2026-0446 · Drive shaft Ø50 · CNC Turning (36 pcs)12h 0m
8 Oct, 19:36 → 8 Oct, 20:00CMD-2026-0458 · Bush Ø60 · CNC Turning (1/2 · 3 pcs)24m
9 Oct, 07:00 → 9 Oct, 15:36CMD-2026-0458 · Bush Ø60 · CNC Turning (2/2 · 57 pcs)8h 36m
9 Oct, 15:36 → 9 Oct, 20:00CMD-2026-0451 · Spur gear z=32 m=2 · CNC Turning (1/2 · 21 pcs)4h 24m
12 Oct, 07:00 → 12 Oct, 07:36CMD-2026-0451 · Spur gear z=32 m=2 · CNC Turning (2/2 · 3 pcs)36m
Band Saw S1 3 blocks · 7h 30m
8 Oct, 07:00 → 8 Oct, 09:30CMD-2026-0458 · Bush Ø60 · Saw cutting (60 pcs)2h 30m
8 Oct, 09:30 → 8 Oct, 11:30CMD-2026-0451 · Spur gear z=32 m=2 · Saw cutting (24 pcs)2h 0m
8 Oct, 11:30 → 8 Oct, 14:30CMD-2026-0440 · Flange DN100 PN16 · Saw cutting (44 pcs)3h 0m
Gear Hobber H1 3 blocks · 15h 0m
8 Oct, 07:00 → 8 Oct, 08:00CMD-2026-0451 · Spur gear z=32 m=2 · Gear hobbing · setup1h 0m
8 Oct, 08:00 → 8 Oct, 20:00CMD-2026-0451 · Spur gear z=32 m=2 · Gear hobbing (1/2 · 21 pcs)12h 0m
9 Oct, 07:00 → 9 Oct, 09:00CMD-2026-0451 · Spur gear z=32 m=2 · Gear hobbing (2/2 · 3 pcs)2h 0m

APS Scheduler sits on top of D&A Management Software. It is not a separate product.

It pays for itself in a shop where several machines can run the same operation, where setups cost real time, and where the order work enters genuinely moves the delivery date. If your flow is simple and you run two machines, we will tell you at the demo that you do not need it.

How it actually decides what runs and when — that is a conversation on screen, with your own orders in front of us.

Licensed separately from the core package.

What it does, concretely

  • Real capacity, not an average

    Which machine can run which operation, how long it actually takes, and what is already on it. Not a load percentage worked out at department level.

  • Sequence moves the date

    The same machines, the same work, a different order — and a different day the job ships. This is where the days are won.

  • See the impact before you commit

    What happens to everything else on the floor if you take this job as well. Before you answer on the phone.

  • The plan on a timeline, to scale

    Every scheduled operation is a block on the shift's hourly axis, machine by machine. Drag a block to another machine or time and the system checks the move before it accepts it.

  • What if, compared against the live plan

    Take a machine down for a window, add a shift, or delay one material, and see which orders become late and which stop being late. The live plan changes only when you confirm.

  • Enabled per company

    D&A works fully without it. We switch it on only if the maths works for you.